Research Article

Preliminary Examination of the System Fly Ash-Bottom Ash-Flue Gas Desulphurization Gypsum-Portland Cement-Water for Road Construction

Table 5

Results of the batch leach test and regulatory limits for the determined elements.

SpecimenLeachate concentration (mg/dm3)
CuZnCdPbNiSbCr

S1 after 7 days<0.10.40.5513<0.1
S1 after 28 days<0.10.10.643190.5
S2 after 7 days<0.10.40.4613.4<0.1
S2 after 28 days<0.10.50.562220.3
WACStable nonreactive hazardous waste in a nonhazardous landfill
550.1110.071
Hazardous waste landfill
10200.5540.57

S1 made from the mixture: 18.6% FA-6.2% PC-6.2% FGD gypsum-31% BA-38% W, FA composed of particles of <1.652 mm.
S2 made from the mixture: 18.6% FA-6.2% PC-6.2% FGD gypsum-31% BA-38% W, FA composed of particles of <0.42 mm.