Research Article

Power Prioritization and Load Shedding in an Island with RESs Using ABC Algorithm

Table 2

Load to be shed under different generation contingencies.

Generated power (MW)Losses (MW)Amount of load to shed (MW)Bus to shed

322.0008.48414.88430
320.0008.40216.80230 and 29
315.0008.24821.64830 and 29
310.0008.08026.48030, 29, and 26
305.0007.93231.33230, 29, 26, and 24
300.0007.80336.20330, 29, 26, and 24
295.0007.69341.09330, 29, 26, and 24
290.0007.60246.00230, 29, 26, 24, and 23