Research Article
Power Prioritization and Load Shedding in an Island with RESs Using ABC Algorithm
Table 2
Load to be shed under different generation contingencies.
| | Generated power (MW) | Losses (MW) | Amount of load to shed (MW) | Bus to shed |
| | 322.000 | 8.484 | 14.884 | 30 | | 320.000 | 8.402 | 16.802 | 30 and 29 | | 315.000 | 8.248 | 21.648 | 30 and 29 | | 310.000 | 8.080 | 26.480 | 30, 29, and 26 | | 305.000 | 7.932 | 31.332 | 30, 29, 26, and 24 | | 300.000 | 7.803 | 36.203 | 30, 29, 26, and 24 | | 295.000 | 7.693 | 41.093 | 30, 29, 26, and 24 | | 290.000 | 7.602 | 46.002 | 30, 29, 26, 24, and 23 |
|
|