Research Article

Power Prioritization and Load Shedding in an Island with RESs Using ABC Algorithm

Table 3

Overload contingency characteristics.

Connected load (MW)Excess load to shed (MW)Buses to shed

335.49.550 
340.414.60330
345.419.66430 and 29
350.424.73330 and 29
353.427.77830, 29, and 26
358.432.80030, 29, 26, and 24
363.437.88030, 29, 26, and 24
368.442.96930, 29, 26, and 24
373.448.06630, 29, 26, 24, and 23