Research Article

Modelling and Output Power Estimation of a Combined Gas Plant and a Combined Cycle Plant Using an Artificial Neural Network Approach

Table 5

Hidden layers’ size impact of the BR training algorithm.

Hidden layersTraining performanceValidation performanceTraining regressionValidation regressionTest regressionStopping criterionIterationBest epoch

1015.78716.9840.9730.9700.971Maximum307306
2015.29416.8520.9740.0000.973Maximum866865
5013.92113.6310.9750.0000.976Maximum epochs10001000
10014.9930.0000.9730.0000.976Maximum epochs10001000
20014.8660.0000.9740.0000.970Validation stops377376
50013.1850.0000.9750.0000.975Maximum epochs10001000