Research Article
Optimal Connection of Offshore Wind Farm with Maximization of Wind Capacity to Power Systems considering Losses and Security Constraints
Figure 4
Hourly behavior of the wind power time series (1 MW) and the load. (a) T12h (1 MW). (b) T13h (1 MW). (c) PL7. (d) PL9.
| (a) |
| (b) |
| (c) |
| (d) |