Research Article
Trust-Region Method for Load Flow Solution of Three-Phase Unbalanced Electric Power Distribution System
Table 5
Type and length of conductor lines of 25-bus network.
| | No. | Line | Conductor type | Length (ft) |
| | 1 | 1–2 | 1 | 1000 | | 2 | 2–3 | 1 | 500 | | 3 | 2–6 | 2 | 500 | | 4 | 3–4 | 1 | 500 | | 5 | 3–18 | 2 | 500 | | 6 | 4–5 | 2 | 500 | | 7 | 4–23 | 2 | 400 | | 8 | 6–7 | 2 | 500 | | 9 | 6–8 | 2 | 1000 | | 10 | 7–9 | 2 | 500 | | 11 | 7–14 | 2 | 500 | | 12 | 7–16 | 2 | 500 | | 13 | 9–10 | 2 | 500 | | 14 | 10–11 | 2 | 300 | | 15 | 11–12 | 3 | 200 | | 16 | 11–13 | 3 | 200 | | 17 | 14–15 | 2 | 300 | | 18 | 14–17 | 3 | 300 | | 19 | 18–20 | 2 | 500 | | 20 | 18–21 | 3 | 400 | | 21 | 20–19 | 3 | 400 | | 22 | 21–22 | 3 | 400 | | 23 | 23–24 | 2 | 400 | | 24 | 24–25 | 3 | 400 |
|
|