Research Article

Security Enhancement of Power Systems through Interline Power Flow Controller (IPFC) under Contingency Condition: A Case Study and Analysis‐EEP 400 kV System

Table 10

LSI during an outage of Sebeta to the Holeta branch with IPFC.

FromToActual MVARated MVALUF (%)NLSI (%)LSI (%)

GG3W/Sodo791.158197340.09915.00732.572
W/SodoGG2166.66619738.4477.9588.301
W/SodoGelan540.544197327.39753.27335.160
W/SodoYirgalem134.24619736.8045.4376.394
GG2Sebeta111.15713418.2897.7518.128
GG2GGnew51.94013413.8730.5332.871
GelanSebeta745.080197337.76411.43229.864
GelanHoleta186.85819739.4712.0467.243
GelanD/Zeit313.985197315.9142.24311.813
SebetaHoleta0.00019730.0000.0000.000
HoletaSululta547.526197327.7513.19820.385
SulultaD/Markos156.883134111.69920.28514.275
SulultaD/Zeit306.821197315.5517.87513.248
SulultaG/Gurcha199.738134114.8958.36912.937
D/MarkosB/Dar342.632134125.55022.80924.728
D/MarkosG/Gurcha480.879134135.8609.80728.044
B/DarBeles350.024134126.1028.80820.914
BelesGERD86.17319734.3687.0075.159
YirgalemGD3130.89419736.63412.3398.346