Journal of Electrical and Computer Engineering / 2022 / Article / Tab 3 / Research Article
Security Enhancement of Power Systems through Interline Power Flow Controller (IPFC) under Contingency Condition: A Case Study and Analysis‐EEP 400 kV System Table 3 Base load data as of 2021.
No Station Region P (MW) Q (Mvar) 1 GG3 SW 458.69 123.51 2 W/Sodo South 335.92 150.57 3 GG2 SW 53.21 22.3 4 Gelan AA 205 95.56 5 Sebeta AA 239.6 110.3 6 Holeta Center 89.38 40.63 7 Sululta AA 153.68 62.87 8 D/Markos NW 98.21 46.35 9 B/Dar NW 143.53 50.76 10 Beles North 20.87 6.33 11 GERD NW 70.22 26.24 12 D/Zeit Center 124.73 63.32 13 Yirgalem South 56.36 39.25 14 GD3 South 73.75 30.03 15 G/Gurcha North 31.62 14.17 16 GGnew SW 47.22 25.63 Total 2201.99 907.82