|
Influence factor | Green scheme |
Green design scheme | Green construction scheme | Green planning scheme |
|
Environmental carrying capacity (E1) | Deepen hydrogeological survey, deepen environmental impact assessment, optimize damage control value and pollution control value standards, and determine the baseline control basis | Implement the comments on environmental impact assessment actively, and propose construction plans with less disturbance, less pollution, and faster repair | / |
|
Green resource conditions (E2) | Apply new technology, new materials, etc. to design engineering structure, optimize occupation control value and consumption control value, and determine the baseline control basis | Apply new technology, new equipment, and other construction organization design, the development of small disturbance, low pollution, less waste, excellent treatment of the construction scheme | Set up green innovation research projects appropriately ahead of schedule |
|
Green knowledge reserve (E3) |
|
Green talent reserve (E4) | Increase the proportion of green designers with green knowledge and practical experience, deepen the effect of green design | The proportion of green construction personnel with rich green knowledge and practical experience should be increased to promote the group’s green ideology and awareness | Overall planning of green knowledge training and education, the establishment of incentive mechanism |
|
Green knowledge innovation (A21) | Promote and apply innovative achievements in time to optimize design schemes | Promote and apply innovative achievements in time to optimize the construction plan | / |
|