Research Article

Experimental Study on Mechanical Properties of Rebar in Steel Half-Grouted Sleeve Connections with Construction Defects

Table 4

Details of the specimens.

TypesSpecimen’s numberDefect parametersNumber

Control groupGT14-BM-1/2/3/3

Rebar offsetGT14-PX-5-1/2/3Grouting end rebar deviated from the center of the sleeve 5 mm3

Rebar bendedGT14-WZ-20-1/2/3Grouting end rebar bended 20 mm3
GT14-WZ-40-1/2/3Grouting end rebar bended 40 mm3
GT14-WZ-60-1/2/3Grouting end rebar bended 60 mm3

Insufficient fluidity of grouting materialGT14-LD-15-1/2/3Grouting material stood for 15 min3
GT14-LD-30-1/2/3Grouting material stood for 30 min3
GT14-LD-45-1/2/3Grouting material stood for 45 min3