Research Article

Optimization of Liner Operations and Fuel Selection considering Emission Control Areas

Table 4

CAPEX and OPEX for the scrubber and SCR equipment.

CAPEXOPEX

Scrubber (m$)2.5–3 (open-loop)1–3% of fuel cost
4.5–5 (closed-loop)

SCR ($/kW)40–1357–10% of fuel cost

Data source: summarized from the literature [48, 49].