Research Article

Solving Stochastic Fuzzy Transportation Problem with Mixed Constraints Using the Weibull Distribution

Table 5

Sensitivity analysis of SFTPMC by the varying probability of .

Probabilities for Probabilities Optimal transportation costUnit flow

0.990.599.6449.25
0.9598.8147.59
0.998.3846.73
0.8598.146.17
0.897.8945.74
0.7597.745.05
0.797.5445.05
0.6597.444.77
0.697.2644.37
0.5597.1444.25
0.597.0244.01
0.4596.943.77
0.496.7843.53
0.3596.6643.29
0.396.5443.05
0.2596.4243.41
0.296.2942.55
0.1596.1642.29
0.19641.97
0.0595.841.57