Research Article

Influence of New Energy Materials on Dynamic Interaction between Surrounding Rock and Structure of Heavy-Duty Railway in Small Clearance Crossing Tunnel

Table 4

Convergence and deformation of the overpass tunnel to the existing left-line shield tunnel.

Section position (m)

After the left-line shield is completed (mm)7.597.858.129.1212.52
After the right-line shield is completed (mm)8.028.158.239.2311.52
After digging is completed (mm)7.567.868.627.9912.56