Research Article

An Optimization Model for the Student-to-Project Supervisor Assignment Problem-The Case of an Engineering Department

Table 4

Project details.

IdentifierP1P2P3P4P5P6P7P8

Project duration (weeks)3232323232323232
Project typeI3I5I6YesI1I4I7I2
Project phaseProject IProject IProject IProject IProject IProject IProject IProject II
Existing or new project?NewNewNewNewNewNewNewExisting
Current PSNoneNoneNoneNoneNoneNoneNonePS2

NB: PS = project supervisor, project I = IMB/MMB 511, project II = IMB/MMB 521, I1 to I7 = Table 2 grouping.