Research Article

[Retracted] Application of Intelligent Robot Palletizer Technology in the Optimization of High-Speed Train Operation and Simulation Verification

Table 1

Configuration table for the parameters of the simulation scenarios.

Station IDMinimum station operating timeInterstation intervalMinimum interval operating time

Shenyang North Highway Yard1——
Liouwangtun Line Station119
West Tieling Station124
West Kaiyuan Station138
West Changtu Station145
East Siping Station1510
South Gongzhuling Station169
West Changchun Station1711