Turbine and economic input parameter in HOMER software.
| Turbine parameter | Description |
| Available head (m) | 25 | Net head | Design flow rate (L/sec) | 9,522 | 50% duration | Minimum flow ratio (%) | 10 | 10% of design flow rate which is limited by the turbine to start generation of power | Maximum flow ratio (%) | 100 | 100% design flow | Efficiency (%) | 96 | Turbine efficiency | Penstock pipe loss | 1.4% | ā |
| Economic parameter ($) | Description |
| Capital cost | 7,847,000 | $3500/kW | Replacement cost | 7,800,000 | Assumed | O&M cost | 313,880 | 4% of capital cost | Lifetime of the project | 30 years | Project lifetime |
|
|