Research Article
Assessment of Wind Characteristics and Wind Power Potential of Gharo, Pakistan
Table 17
Wind turbine capacity factor for a period of one year.
| Wind turbine | WT-A (2300/82.4) | WT-B (2750/80) | WT-C (2300/90) | WT-D (2500/80) | WT-E (2000/80) | WT-F (2750/92) | Months | CF | CF | CF | CF | CF | CF |
| 1 | 10 | 8 | 13 | 8 | 12 | 11 | 2 | 14 | 11 | 19 | 12 | 17 | 16 | 3 | 15 | 12 | 19 | 12 | 17 | 16 | 4 | 32 | 27 | 38 | 28 | 35 | 34 | 5 | 54 | 49 | 59 | 51 | 57 | 56 | 6 | 46 | 40 | 51 | 42 | 49 | 48 | 7 | 57 | 52 | 62 | 54 | 60 | 58 | 8 | 38 | 33 | 45 | 35 | 42 | 41 | 9 | 44 | 39 | 50 | 40 | 48 | 46 | 10 | 12 | 9 | 15 | 10 | 14 | 13 | 11 | 7 | 5 | 09 | 5 | 8 | 7 | 12 | 10 | 8 | 13 | 8 | 12 | 11 | Average (%) | 28.25 | 24.41 | 32.75 | 25.41 | 30.91 | 29.75 |
|
|