Research Article
Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway
Figure 29
Position relation between building B and the middle line of the tunnel and the displacement time series of a PS point on the building.