Research Article

Integration of Multiband InSAR and Leveling Measurements for Analyzing the Surface Subsidence of Shield Tunneling at Beijing-Zhangzhou High-Speed Railway

Figure 30

Position relation between building C and tunnel midline and the displacement time series at the PS point on the building.