Research Article
[Retracted] Intelligent Evaluation Method of Engineering Cost Feasibility Model Based on Internet of Things
Table 1
Engineering characteristic index values.
| Serial number | Construction area | Layers | Doors and windows | Eaves high | Structure type | Installation work |
| 1 | 1 | 18 | 2 | | 1 | 4 | 2 | 2 | 20 | 6 | | 1 | 4 | 3 | 2 | 24 | 2 | | 1 | 3 | 4 | 1 | 19 | 4 | | 2 | 2 | 5 | 2 | 25 | 3 | | 2 | 1 | 6 | 2 | 23 | 2 | | 1 | 4 | 7 | 2 | 19 | 1 | | 1 | 2 | 8 | 1 | 18 | 5 | | 3 | 3 | 9 | 1 | 24 | 2 | | 1 | 4 | 10 | 2 | 25 | 3 | | 1 | 2 |
|
|