Research Article

Cost Control and Project Cost Analysis of Intelligent Building under Internet of Things

Table 2

The changing trend of total construction cost under different construction cost levels.

ItemMult terminalSurveillance systemHigh decouplingProgram approvalQuality inspection

BPM1.823.563.472.22.26
BIM3.443.793.973.695.34
GIS5.22.481.365.994.68
Panoramic4.23.053.484.612.76
BIMVR3.871.562.666.892.86
Cost6.242.615.621.43.33