Research Article
Cost Control and Project Cost Analysis of Intelligent Building under Internet of Things
Table 2
The changing trend of total construction cost under different construction cost levels.
| Item | Mult terminal | Surveillance system | High decoupling | Program approval | Quality inspection |
| BPM | 1.82 | 3.56 | 3.47 | 2.2 | 2.26 | BIM | 3.44 | 3.79 | 3.97 | 3.69 | 5.34 | GIS | 5.2 | 2.48 | 1.36 | 5.99 | 4.68 | Panoramic | 4.2 | 3.05 | 3.48 | 4.61 | 2.76 | BIMVR | 3.87 | 1.56 | 2.66 | 6.89 | 2.86 | Cost | 6.24 | 2.61 | 5.62 | 1.4 | 3.33 |
|
|