Cost Control and Project Cost Analysis of Intelligent Building under Internet of Things

Table 3

Trend of total cost and conventional total cost.

ItemProgram approvalQuality inspectionConstruction confessionEngineering inspectionSafety management

BIM2.991.652.881.042.75
GIS4.074.882.612.315.39
Panoramic2.543.681.424.474.81
BIMCP5.575.666.654.162.12
Lightweight2.014.593.096.665.05