Research Article

Smart City Economic Management Prediction Model Based on Information Analysis System

Table 2

Test cases and results of data exchange function.

Serial numberTest itemTest descriptionResult

1Server registrationFill in each attribute of the server and save itThe server was added correctly

2Add nodeFill in node name, IP address, and other attributesThe node was added correctly, and the connection was successful

3Connecting linkEstablish a connection link between the commission office node and the data center nodeThe links are added correctly and can interact with each other

4Create file exchange processSpecify the source directory and target directory and establish the exchange processThe process is properly established and operational

5Create file exchange taskSpecify the exchange frequency and other attributes and establish the exchange taskThe task is properly established and can be run

6Start file exchangeStart exchange process and taskProcesses and tasks are performed normally, and documents are exchanged from the commission office to the data center