Research Article
Smart City Economic Management Prediction Model Based on Information Analysis System
Table 2
Test cases and results of data exchange function.
| Serial number | Test item | Test description | Result |
| 1 | Server registration | Fill in each attribute of the server and save it | The server was added correctly |
| 2 | Add node | Fill in node name, IP address, and other attributes | The node was added correctly, and the connection was successful |
| 3 | Connecting link | Establish a connection link between the commission office node and the data center node | The links are added correctly and can interact with each other |
| 4 | Create file exchange process | Specify the source directory and target directory and establish the exchange process | The process is properly established and operational |
| 5 | Create file exchange task | Specify the exchange frequency and other attributes and establish the exchange task | The task is properly established and can be run |
| 6 | Start file exchange | Start exchange process and task | Processes and tasks are performed normally, and documents are exchanged from the commission office to the data center |
|
|