Research Article
Application of Digital Twins to Flexible Production Management: Taking a Shandong Factory as an Example
Table 1
Show the issues that arose throughout the debugging process.
| Serial number | Problems in case debugging |
| 1 | The program is not working. | 2 | The software system’s assignment is erroneous, resulting in a disordered program | 3 | The platform equipment’s height is improper, and the stacker cannot take up the products. | 4 | The motor’s rotational direction is incorrect and cannot transport the material. | 5 | The material could not be transported from station A to station B because the signal transmission between the two stations failed. | 6 | Poor power contact of a motor causes the conveyor to be unstable. | 7 | The frequency of wireless transmission is wrong, and the signal transmission fails. | 8 | A disturbed scheduler leads to inefficient equipment. |
|
|