Research Article

[Retracted] Design of PPP Project under Computer Network and Different Capital Structures

Table 2

Cost-saving efficiency table of the bidder.

GroupsEngineering construction efficiency/R2Engineering cost/R2

Reference group0.7610.911
Observation group0.9930.821
T4.3625.933
P0.0030.006