Research Article
[Retracted] Design of PPP Project under Computer Network and Different Capital Structures
Table 2
Cost-saving efficiency table of the bidder.
| Groups | Engineering construction efficiency/R2 | Engineering cost/R2 |
| Reference group | 0.761 | 0.911 | Observation group | 0.993 | 0.821 | T | 4.362 | 5.933 | P | 0.003 | 0.006 |
|
|