Research Article

Application of GPS Measurement Technology and Computer Technology in Visual Construction Simulation of Construction Engineering

Table 14

135° measurement angle.

Construction time (h)0721442885768641152

Tan delta integral valueLow0.002620.002730.003490.004410.005970.009740.01953
In the middle0.209950.22650.253830.323490.38590.495170.69442
High1.293171.337751.369541.625671.870252.501873.02835

The tangent slopeLow2.06507e − 62.48846e − 63.02469e − 64.47569e − 69.79987e − 62.14575e − 54.68725e − 5
In the middle2.11826e − 42.27312e − 42.44727e − 42.8383e − 43.81778e − 45.13528e − 46.90129e − 4
High9.20683e − 49.74877e − 40.001030.001170.001480.001890.0024

The curvatureLow1.64505e − 98.56711e − 92.08712e − 81.92802e − 83.33177e − 89.23766e − 86.3643e − 8
In the middle6.36674e − 82.96049e − 76.386e − 74.62428e − 74.91003e − 78.36467e − 73.54818e − 7
High2.24259e − 71.02926e − 62.18929e − 61.54147e − 61.54741e − 62.4923e − 69.9975e − 7

Condition serial number1112233