Research Article

Construction of Underground 3D Visualization Model of Mining Engineering Based on Shear-Warp Volume Computer Rendering Technology

Figure 4

The method of adding multiple sections to the center line of the floor to build a roadway model. (a) Position of the section on the centerline. (b) Roadway entities are generated between sections.
(a)
(b)