Research Article

Construction of Underground 3D Visualization Model of Mining Engineering Based on Shear-Warp Volume Computer Rendering Technology

Figure 5

Roadway model built by double contour method. (a) Measured contour line of top and bottom plate. (b) The roadway entity generated by the connection between the roof and the floor.
(a)
(b)