Research on Construction Cost Control Technology of Construction Project Based on Big Data Analysis Theory
Table 5
The weight ranking of the three-level indicators of construction cost control on the target layer.
| | Second indexes | Third indexes | Weight | Sort order | Consistency ratio |
| | Labour charge U11 | U111 | 0.207 | 1 | 0.0851 < 0.1 | | U112 | 0.135 | 2 | | U113 | 0.091 | 5 | | U114 | 0.041 | 10 | | Material cost U12 | U121 | 0.102 | 4 | | U122 | 0.055 | 8 | | U123 | 0.027 | 12 | | Machinery cost U13 | U131 | 0.056 | 7 | | U132 | 0.029 | 11 | | Special cost U21 | U211 | 0.123 | 3 | | U212 | 0.050 | 9 | | Commission fee U22 | U221 | 0.061 | 6 | | U222 | 0.023 | 13 |
|
|