Research Article
Stability Analysis of Dump Slope: Taking Zijinshan Open-Pit Mine as an Example
Table 2
Calculation summary of expanded volume of north side dump.
| Elevation | Height (m) | Average area (m2) | Volume (m3) |
| 450 m~460 m | 10 | 339455.04 | 339.46 | 460 m~490 m | 30 | 448014.42 | 1344.04 | 490 m~520 m | 30 | 455404.75 | 1366.21 | 520 m~550 m | 30 | 428619.77 | 1285.86 | 550 m~580 m | 30 | 402917.48 | 1208.75 | 580 m~610 m | 30 | 348106.94 | 1044.32 | 610 m~640 m | 30 | 274083.62 | 822.25 | 640 m~670 m | 30 | 188592.36 | 565.78 | 850 m~880 m | 30 | 560089.55 | 1680.27 | 880 m~910 m | 30 | 477206.49 | 1431.62 | Amount | 280 | 3922490.42 | 11088.56 |
|
|