Research Article
A Comparative Study of Three Different Mathematical Methods for Solving the Unit Commitment Problem
Table 6
The numerical results for LR, PF, and ALPF methods.
| | Compared items | LR | PF | ALPF |
| | Feasible cost ($) | 56381.931 | 55801.477 | 55233.897 | | Dual cost ($) | 55428.014 | 55305.332 | 54894.266 | | Duality gap (%) | 1.1721 | 0.8971 | 0.6187 | | Number of iterations | 19 | 36 | 67 | | Duration time () | 5.32 | 3.56 | 14.63 |
|
|