Research Article

Change Point Detection with Robust Control Chart

Table 8

Precision of the estimator when used with proposed MM chart for different magnitudes of process change (magnitude of shift, ) based on 10,000 trials. Subgroup size , change point (normal distribution).

Magnitude of shift,

0.25900.59610.8163
0.48000.82880.9415
0.62400.91250.9777
0.70900.95350.9878
0.76000.97140.9878
0.79800.97830.9928
0.82400.98110.9935
0.86100.98220.9935
0.88300.98390.9935
0.89600.98680.9935
0.91300.98770.9935