Research Article
A Stone Resource Assignment Model under the Fuzzy Environment
Algorithm 2
Possibilistic constraint check.
| Input: Decision variables | | Output: The possibility | | Step 1. Set as a lower estimation | | Step 2. Randomly generate from the -level set of the fuzzy numbers | | Step 3. Set | | Step 4. If and , set | | Step 5. Repeat the second and third steps times | | Step 6. Return . |
|