Research Article
A Parallel Implementation of Unscheduled Flow Control in Interconnected Power Systems
Table 4
Averaged values for objectives and constraints (population size is 100, iteration number is 100).
| | Path 1 [MW] | Path 2 [MW] | Path 3 [MW] | P
loss [MW] | Q
loss [MVAR] |
| Base case | 92.90 | 46.04 | −101.16 | 408.316 | 5504.18 | Target | 100 | 60 | −100 | | | Test results | 101.1533 | 54.0599 | −97.4213 | 412.2546 | 5526.4 |
| Best fitness | 0.7741 |
|
|