Journals
Publish with us
Publishing partnerships
About us
Blog
Mathematical Problems in Engineering
Journal overview
For authors
For reviewers
For editors
Table of Contents
Special Issues
Mathematical Problems in Engineering
/
2012
/
Article
/
Tab 5
/
Research Article
A Parallel Implementation of Unscheduled Flow Control in Interconnected Power Systems
Table 5
Averaged fuzzy membership values for objectives and constraints (population size is 100, iteration number is 100).
min
(
μ
)
μ
Path 1
μ
Path 2
μ
Path
3
μ
P
loss
μ
Qloss
Base case
0.0001
0.1163
0.0001
1.000
0.4451
0.4451
Test results
0.3750
0.8255
0.4382
0.8350
0.4391
0.4422