Research Article
A Hybrid Multiobjective Genetic Algorithm for Robust Resource-Constrained Project Scheduling with Stochastic Durations
Algorithm 1
Pseudocode of the Serial Schedule Generation Scheme (SSGS).
| | | | | Obtain the maximum finish time of the predecessors: | | | | Determine the earliest time point, , which satisfying the resource con- | | straints and . | | Set . | | end while |
|