Research Article

Complex System Optimization Using Biogeography-Based Optimization

Table 3

NDRS cost rank and feasibility for the power converter problem after 100,000 function calls. For each metric, a smaller number means better performance.

AlgorithmNDRS cost rankFeasibility

MDF10
BBO/Complex/Multi30
IDF40
BBO/Complex/Single60
CO60