Development of a Carbon Emission Calculations System for Optimizing Building Plan Based on the LCA Framework

Table 3

Inventory of materials and transport in plan 1.

Building subsystemMaterial Quantity (t) Transport distance (km) Transport type (road/rail/ocean)Cost (£K)

SubstructureConcrete9560Road9.5
Steel13.4140Road0.4
Plywood 3.3100Road5.3
Block20.2100Road3
Bricks9.6100Road3

RoofSteel 10.1140Road12.3
Timber480Road6.6
Waterborne paint0.670Road1
Polystyrene 0.0270Road0.4

WallsSteel 1.2140Road5.5
Timber 1.380Road2
Plasterboard290Road1.3
Plaster0.3160Road0.7
Block 62.780Road12.2
Bricks34.5100Road10.7
Paint 1.860Road2.4

Windows and doorsGlass 170Road11.9
Timber 1.280Road14.5
Paint 0.360Road 0.4

CeilingPlaster 0.4160Road0.8