Research Article
Berth Allocation Problem with Quay Crane Assignment for Container Terminals Based on Rolling-Horizon Strategy
Table 2
The results under different .
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Note: TST: total time staying at terminal; FC: fluctuations of cranes; LRW: length of the rolling window. |