Research Article

Real-Time Track Reallocation for Emergency Incidents at Large Railway Stations

Table 9

Comparison of optimization results.

TrackCost of GTs (min)Optimal resultsOriginal results
FrequencyCost (min)FrequencyCost (min)

12.28636.85836.858
22.28624.57236.858
32.33324.66636.999
42.14324.28636.429
51.947.635.7
62.11136.33336.333
724836
82.312.336.9
924824
101.83347.33223.666
112.312.324.6