Research Article

Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration

Table 4

Part of index sets after being normalized.

Number of main transformer in current periodConstruction area
(main control building)
Land area
(total station)
CableThe capacity of main transformer

−0.98799 −0.93393 −0.99303 −0.93393 −0.69970
−0.98718 −0.92949 −0.99474 −0.92949 −0.67949
−0.99251 −0.94757 −0.98502 −0.94757 −0.62547
−0.99240 −0.95916 −0.98996 −0.95959 −0.61977
−0.98918 −0.93514 −0.97838 −0.93514 −0.45946
−0.99022 −0.94132 −0.98533 −0.94132 −0.75550
−0.99170 −0.94216 −0.98373 −0.94216 −0.58506
−0.99286 −0.94286 −0.98571 −0.94286 −0.42857
−0.98507 −0.90000 −0.98507 −0.90000 −0.25373
−0.99145 −0.95701 −0.98316 −0.95701 −0.57265
 ⋮