Research Article
Prediction Technology of Power Transmission and Transformation Project Cost Based on the Decomposition-Integration
Table 4
Part of index sets after being normalized.
| Number of main transformer in current period | Construction area (main control building) | Land area (total station) | Cable | The capacity of main transformer | ⋯ |
| −0.98799 | −0.93393 | −0.99303 | −0.93393 | −0.69970 | ⋯ | −0.98718 | −0.92949 | −0.99474 | −0.92949 | −0.67949 | ⋯ | −0.99251 | −0.94757 | −0.98502 | −0.94757 | −0.62547 | ⋯ | −0.99240 | −0.95916 | −0.98996 | −0.95959 | −0.61977 | ⋯ | −0.98918 | −0.93514 | −0.97838 | −0.93514 | −0.45946 | ⋯ | −0.99022 | −0.94132 | −0.98533 | −0.94132 | −0.75550 | ⋯ | −0.99170 | −0.94216 | −0.98373 | −0.94216 | −0.58506 | ⋯ | −0.99286 | −0.94286 | −0.98571 | −0.94286 | −0.42857 | ⋯ | −0.98507 | −0.90000 | −0.98507 | −0.90000 | −0.25373 | ⋯ | −0.99145 | −0.95701 | −0.98316 | −0.95701 | −0.57265 | ⋯ |
⋮
| ⋮ | ⋮ | ⋮ | ⋮ | ⋮ |
|
|