Research Article

Unit-Specific Event-Based and Slot-Based Hybrid Model Framework with Hierarchical Structure for Short-Term Scheduling

Table 1

Data of production capability and coefficients of processing time for example 1.

T1T2T3T4

R140800.50.0250.750.0375
R225500.50.040.750.06
R340800.250.01250.50.025

in kg, in h, and in h/kg.