Research Article
An Ant Optimization Model for Unrelated Parallel Machine Scheduling with Energy Consumption and Total Tardiness
| Local Search Algorithm: | | Set IterationNum = 1; | | While (IterationNum < MaxIterationNum) | | For each machine | | For each job in machine | | For each job () in machine | | Construct new solution by exchanging two jobs | | If the new solution is better than current one, then exchange two jobs | | Find the machine with the highest objective value | | Find the machine with the lowest objective value | | For each in machine | | For each in machine | | Construct new solution by exchanging two jobs | | If the new solution is better than current one, then exchange two jobs |
|