Research Article

Dynamic Environmental/Economic Scheduling for Microgrid Using Improved MOEA/D-M2M

Figure 2

Columns from left to right: the optimization results using I-MOEA/D-M2M; the optimization results using SPEA2; the optimization results using NSGAII. Rows: the optimization results under 50 kW load demand; the optimization results under 100 kW load demand; the optimization results under 150 kW load demand.
(a)
(b)
(c)
(d)
(e)
(f)
(g)
(h)
(i)