Research Article

Dynamic Environmental/Economic Scheduling for Microgrid Using Improved MOEA/D-M2M

Figure 4

The iterative processes of NSGAII and I-MOEA/D-M2M under 100 kW load demand. Rows: the optimization results after 600, 1000, and 2000 generations using NSGAII; the optimization results after 100, 300, and 500 generations using I-MOEA/D-M2M.
(a)
(b)
(c)
(d)
(e)
(f)