Research Article
Dynamic Environmental/Economic Scheduling for Microgrid Using Improved MOEA/D-M2M
Figure 4
The iterative processes of NSGAII and I-MOEA/D-M2M under 100 kW load demand. Rows: the optimization results after 600, 1000, and 2000 generations using NSGAII; the optimization results after 100, 300, and 500 generations using I-MOEA/D-M2M.
(a) |
(b) |
(c) |
(d) |
(e) |
(f) |