Research Article

Dynamic Environmental/Economic Scheduling for Microgrid Using Improved MOEA/D-M2M

Table 3

Parameter settings of the MG system components.

ParametersMTFCBATPVWT

123456–89–11
(/kWh)7.58 × 10−39.35 × 10−316.12 × 10−317.74 × 10−37.3 × 10−300
()342.82342.821222.21222.222.841259.8623.41
(%)54.9954.9936.7336.7332.6729.3422.13
0.7520.0692−0.0023−0.0026
−0.3095−0.29040.67350.5821
0.41740.3752
0.10680.1090
(kg/kW)4.09 × 10−42.54 × 10−45.33 × 10−44.87 × 10−4
(kg/kW)−5.55 × 10−4−6.05 × 10−4−3.55 × 10−4−4.23 × 10−4
(kg/kW)6.49 × 10−45.64 × 10−43.38 × 10−42.46 × 10−4
Ramp rate (kW/min)0.330.330.250.25