Research Article
Parameter Improvement of the Soccer League Competition Algorithm by Introducing Stubborn Players: Application to Water Distribution Network
Table 13
Sensitivity analysis of the input parameters.
| Parameter | Two-loop | Hanoi | New York | (%) | (%) | | Evalu | Cost | Run time | Evalu | Cost | Run time | Evalu | Cost | Run time |
| 0 | 0 | 1 | 1900 | 419 000 | 2.64 | 68500 | 6 081 087 | 4.02 | 15800 | 38.64 | 3.18 | 5 | 5 | 2 | 1502 | 419 000 | 2.33 | 68495 | 6 081 087 | 3.99 | 15792 | 38.64 | 3.04 | 10 | 10 | 3 | 1465 | 419 000 | 2.27 | 68490 | 6 081 087 | 3.56 | 15788 | 38.64 | 2.67 | 20 | 20 | 4 | 1392 | 419 000 | 2.12 | 68485 | 6 081 087 | 3.42 | 15781 | 38.64 | 2.55 | 30 | 30 | 5 | 1109 | 419 000 | 2.09 | 68480 | 6 081 087 | 3.37 | 15779 | 38.64 | 2.33 | 40 | 40 | 6 | 1001 | 419 000 | 1.73 | 68475 | 6 081 087 | 3.35 | 15768 | 38.64 | 2.21 | 50 | 50 | 7 | 954 | 419 000 | 1.65 | 68445 | 6 081 087 | 3.31 | 15765 | 38.64 | 2.15 | 60 | 60 | 8 | 869 | 419 000 | 1.62 | 68440 | 6 081 087 | 3.29 | 15742 | 38.64 | 2.08 | 70 | 70 | 9 | 701 | 419 000 | 1.45 | 68435 | 6 081 087 | 3.25 | 15703 | 38.64 | 2.01 | 80 | 80 | 10 | 602 | 419 000 | 1.37 | 68433 | 6 081 087 | 3.17 | 15596 | 38.64 | 2.00 | 90 | 90 | 11 | 503 | 419 000 | 1.28 | 68302 | 6 081 087 | 3.15 | 15584 | 38.64 | 1.98 | 100 | 100 | 12 | 375 | 419 000 | 1.24 | 68219 | 6 081 087 | 3.09 | 15347 | 38.64 | 1.85 |
| Mean | 1031 | 419 000 | 1.82 | 68433 | 6 081 087 | 3.41 | 15 311 | 38.64 | 2.34 |
|
|