Research Article

A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness

Table 3

Effectiveness of the lower bounds.

ACPUTANNGNI#

8<0.010.01685429090
120.030.581008264989090
160.75111.931385533269959090
2033.721967.48423917390778679054

Average CPU time.
Average number of nodes generated in the branch and bound procedure.
#Number of instances (out of 90 instances) that were solved within 3600 seconds.