Research Article
A Two-Stage Assembly-Type Flowshop Scheduling Problem for Minimizing Total Tardiness
Table 3
Effectiveness of the lower bounds.
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Average CPU time. ‡Average number of nodes generated in the branch and bound procedure. #Number of instances (out of 90 instances) that were solved within 3600 seconds. |