Research Article
Evaluating CCS Investment of China by a Novel Real Option-Based Model
Table 1
Parameters description of the case study.
| Parameter | Coal-fired plant | PC + CSS |
| Electricity output (MWh) | 3 × 106 | 3 × 106 | Capital cost (yuan) | 2.6 × 109 | 4.8 × 109 | O&M cost (yuan/year) | 3 × 108 | 3.6 × 108 | Coal consumption (ton) | 325 g/kWh 3 × 106 MWh = 975,000 tons | 1170,000 tons (CCS efficiency loss rate is 20%) | Emission factor (g CO2/kWh) | 893 g/kWh | 893 g/kWh | Emission quantity (ton) | 893 3 × 106 MWh = 2,679,000 tons | 267,900 tons (CCS capture rate is 90%) | Electricity price (yuan/MWh) | 316 | 428 | Risk-free rate | 4% | |
|
|