Research Article

An Efficient Heuristic Approach for Irregular Cutting Stock Problem in Ship Building Industry

Table 5

Results obtained from real-life data.

Ins.Num. of itemsSize of stock sheetPD of the approachesAverage computational time
(mm) (mm)GPSORealEF + BLFMGPSORealEF + BLFM

1400452021700.6610.6310.71271.3102.382.4
2420523821700.7660.7550.81771.6101.782.7
3300434021700.6010.5500.65150.780.661.8
4480448821700.5540.4990.60672.5103.483.6
5500523621700.6400.5980.70172.8103.583.9
69001188021700.4260.3760.477174.1204.2185.4
710001188023400.2360.2060.287195.4225.1206.1
810001188024300.4020.3520.453195.2224.9206.3
98801188024700.5150.4650.566173.9204.8184.8
108501188021700.4560.3980.507172.5202.6183.2